• deutsch

Malzfabrik News Overview

Image 1 of 3
Move up!
Friday | 07. April 2017
1 | 3

Move up!

The infrastructure of our Kachelhaus event spaces is expanding. The staircase connecting the Maschinenhalle, Speicher, Studio, the Lichtkeller and the Wirtshaus zum Oberstübchen will be equipped with an elevator. The historic elevator shaft, considered a relic of the Malzfabrik history, will be refurbished.

 

A professional crew is now working on the railing. The steel structure as well as the new gate of the elevator shaft receive a new paint job, getting everything ready for the installation of the cabin.

 

We are looking forward to the first ride up!